SunTera G3
6.25MWh IEC
The Jinko ESS 6.25 MWh energy storage system leverages our latest liquid-cooled technology and high-capacity 588 Ah LiFePO4 cells to achieve industry-leading energy density, safety, and efficiency. Engineered for grid-scale applications, it maximizes storage capacity and long-term reliability in a standardized 20-foot container layout.
Product Superiority
Extreme Safety, Longer Lifespan
Intelligent liquid cooling with multi-mode control ensures precise cell temperature, improving consistency and extending system lifespan.
  • Cell Chemistry: LFP + aerogel insulation
  • DC Side Protection Levels: 4-level (cell → module → rack → system)
  • Thermal Runaway Propagation: UL 9540A passed — single-cell failure does not propagate
  • Rack-Level Leakage Detection Response: <100 ms
  • Cell Temperature Differential: ≤2.5°C
  • Operating Temperature Range: –40°C to +55°C
  • Altitude: ≤4,500m
Higher Efficiency, More Revenue
Refined system management improves overall efficiency and unlocks additional usable capacity, directly increasing customer returns.
  • System RTE: ≥95%
  • PCS Conversion Efficiency: ≥98.5%
  • Site-Wide Coordinated Response (EMS): <200 ms
  • SVG Reactive Power Compensation: Built-in PCS
  • Container Capacity: 6.25 MWh in 20-ft standard container
  • Multi-Unit VSG Parallel Operation: Supported with circulating current suppression
Comprehensive Safety, Zero Worries
Active cell-to-system safety architecture with hybrid gas + water fire suppression prevents thermal runaway and ensures system safety.
  • Grid-Forming Overload Capability: 3× rated current
  • Black Start Time: <0.5 s
  • Ingress Protection: IP55
  • Operating Temperature Range: –40°C to +55°C
  • ≤4,500m: ≤4,500m
  • Certifications: UL9540A / IEC62619 / NFPA68 / NFPA69 / NFPA855
Easy Deployment, Effortless Operation
AI-powered control and flexible configuration enable fast commissioning, lower O&M costs, and adaptability for maximum ROI.
  • Factory Pre-Commissioning: >90% (BMS/PCS/EMS/fire/thermal full-link)
  • On-Site to Grid Connection Cycle: 7–10 days (vs 30–45 days conventional)
  • On-Site Installation Labor Reduction: ↓70%
  • On-Site Commissioning Time Reduction: ↓50%
  • Container Type: 20-ft standard container (all-in-one with MV transformer + ring network unit)
  • OTA Upgrade: One-click, station-wide
Application Scenarios
Generation-side
Enhance the stability, continuity, and controllability of renewable energy generation, thereby providing stability support to the power grid.
Grid-side
Participate in grid dispatching to meet peak-shaving and frequency-regulation requirements, thereby improving the flexibility and stability of the power system.
User
Alleviate grid load, meet diverse electricity demand from end-users, strengthen power-supply reliability on the user side, and improve the overall user experience of electricity consumption.